序号NO

厂名

Client Name

地址

Address

项目

Project

设备产地

Equipment Original Place

建设时间

Construction Period

1

抚顺发电厂

Fushun Power Plant

辽宁省抚顺市

Fushun City of Liaoning Province

建筑 civil work

boiler : 9×130t/h,3×40t/h

turbine generator :

3×12MW,1×25MW, 3×50MW

哈尔滨

Harbin

原苏联

Former Soviet Union

1952-1959

技术改造

Technical renovation

boiler : 2×670t/h

turbine generator : 2×200MW

哈尔滨 Harbin

1992-1996

2000-2002

 

2

辽宁发电厂

Liaoning Power Plant

辽宁省抚顺市

Fushun City of Liaoning Province

建筑 civil work

boiler : 3×230t/h,

4×220t/h,5×200t/h,1×170t/h

turbine generator : 13×50MW

原苏联

Former Soviet Union

原民主德国

Former Democratic Republic of Germany

原捷克斯洛伐克

Former Czecho-slovakia

哈尔滨 Harbin

1958-1966

boiler : 2×670t/h

turbine generator : 2×200MW

哈尔滨 Harbin

1988-1990

2×350MW机组建筑工程

2×350MW generating unit civil work

boiler : 1×1163t/h

哈尔滨 Harbin

2003.4-

2005.1

3

江油发电厂

Jiangyou Power

Plant

四川省江油市

Jiangyou City of Sichuan Province

boiler : 3×220t/h,1×210t/h

turbine generator : 4×50MW

波兰 Poland

哈尔滨 Harbin

 

1965-1971

boiler : 1020t/h

turbine generator : 1×330MW

法国 France

1988-1990

4

朝阳发电厂

Chaoyang Power Plant

辽宁省朝阳市

Chaoyang City of Liaoning Province

建筑 civil work

boiler :2×670t/h

turbine generator : 2×200MW

哈尔滨 Harbin

1967-1975

5

中电国际清河发电厂

CPI Qinghe Power plant

辽宁省铁岭市

Tieling City of Liaoning Province

boiler:1×670t/h

turbine generator : 1×200MW

原苏联

Former Soviet Union

1975-1977

一期技改工程

Technical  innovation project of replacing small units with big ones

boiler : 1900 t/h

turbine generator : ×600MW

哈尔滨 Harbin

2006-2010.3.16

二期技改工程Phase

technical innovation project

建筑 civil work

boiler : 1900 t/h

turbine generator : 1×600MW

哈尔滨 Harbin

2009.7-2011.6

6

元宝山发电厂

Yuanbaoshan

Power Plant

内蒙古赤峰市

Chifeng City of Inner

Mongolia Autonomous Region

建筑 civil work

boiler : 1×921t/h,1×1832t/h

turbine generator : 1×300MW     

                  1×600MW

瑞士Switzerland

原联邦德国

Former Federal Republic of Germany

法国 France

 

1975-1985

三期扩建附属及公用系统工程

2×600MW unit of phase civil work of unit4; civiland

erection works of unit 3 and particl BOP system

exparsion project Bop and common system of  phase

 

boiler : 1×2008t/h

turbine generator: 1×600MW

 

1992-1998

三期复建工程 Resume construction of phaseproject

boiler :1×2008t/h

turbine generator :1×600MW

哈尔滨 Harbin

2005.8.15-

2007.7.31

7

抚顺钢铁公司

Fushun Steel Works

辽宁省抚顺市

Fushun City of Liaoning Province

转炉

converter furnace ::2×15t 

电炉

electric furnace :1×30t 

 

 

1986-1989

1992-1994

8

沙角(B)发电厂

Shajiao B Power Plant

广东省东莞市

Dongguan City of Guangdong Province

boiler : 2×1070t/h

日本 Japan

1986-1987

9

蛇口月亮湾燃机电厂

Shekou Moon Bay Gas Turbine Power Plant

广东省深圳市

Shenzhen City of Guangdong Province

turbine generator :2×47MW

美国 USA

1990-1991

10

大亚湾核电站

Daya Bay Nuclear Power Station

广东省深圳市

Shenzhen City of Guangdong Province

2×900MW BOP 工程

2×900MW BOP project

法国 France

1989.3-1994.5

BOP 维修工程

BOP maintenance project

 

1993-现在1993-Present

11

华电铁岭发电厂

Huadian Tieling Power Plant

辽宁省铁岭市

Tieling City of Liaoning Province

设备采购 equipment procurement

建筑安装 civil & erection work

boiler : 4×1021t/h

turbine generator : 4×300MW

哈尔滨 Harbin

1990-1996

二期2×600MW超超临界机组建筑及5号机组安装工程

2×600MW ultra supercritical units of phase, civil works of two units and erection work of unit 5

哈尔滨 Harbin

2006.6.18-

2008.7.4

12

佛山沙口发电厂

Foshan Shakou Power Plant

广东省佛山市

Foshan City of Guangdong Province

燃机  gas-turbine 1×150MW

boiler : 2×150t/h

turbine generator : 1×100MW

荷兰 NEM

NEM of The Netherlands

瑞士 ABB

ABB of Switzerland

1993-1994

13

深圳西部发电厂

Shenzhen West Power Plant

广东省深圳市

Shenzhen City of Guangdong Province

2×300MW 发电机组汽机、电气、热工系统安装、调试工程  Erection and commissioning work of turbine,electrical and IC system  of 2×300MW power generating units

哈尔滨 Harbin

1996-1997

2号机海水脱硫工程Sea water desulfurization of Unit 2 project

挪威 ABB

ABB of Norway

1998-1999

14

鸭河口发电厂

Yahekou Power Plant

河南省南阳市

Nanyang City of Henan  Province

boiler : 1097t/h

turbine generator : 1×350MW

西班牙 Spain

1996-1998

15

华能丹东发电厂

Huaneng Dandong Power Plant

辽宁省丹东市

Dandong City of Liaoning Province

1号机组建筑安装

civil & erection works of unit 1

boiler : 1163t/h

turbine generator : 1×350MW

美国 USA

1996-1998

16

漳州后石发电厂

Zhangzhou Houshi Power Plant

福建省漳州市龙海市

Longhai City of Zhangzhou City Fujian Province

4×1950t/h炉本体除尘器、磨煤机、烟风道、主蒸汽管道、空气预热器安装工程

boiler 4× 1952t/h  erection work of boiler proper, precipitator, coal mill, flue gas and air ductwork, main steam pipelines, air preheater etc.

日本 Japan

挪威 ABB

ABB of Norway

1998-2002

17

岭澳核电站

Ling Ao Nuclear Power Station

广东省深圳市

Shenzhen City of Guangdong

2×1000MW  BOP 工程

2×1000MW  BOP project

法国 France

1998-2002

BOP 维修工程

BOP maintenance project

 

2002-现在

2002-Present

 

18

湄洲湾发电厂

Meizhou Bay Power Plant

福建省莆田市

Putian City of

Fujian Province

2×362MW 机组BOP 安装工程

2×362MW  BOP project

美国 FMC

FMC USA

1999.3-2000.10

19

华明章丘发电厂(一期)

Huaming Zhangqiu

Power Plant (Phase)

山东省章丘市

Zhangqiu City of Shandong Province

一期工程建筑安装

civil & erection works of phase

boiler : 2×425t/h

turbine generator : 2×135MW

上海 Shanghai

济南

Jinan

2001.5.1-

2002.12.30

20

绥中发电厂

Suizhong Power Plant

辽宁省葫芦岛市

Huludao City of Liaoning Province

一期2×800MW机组输煤建筑安装等附属工程

Auxiliary project such as civil & erection work of  coal handling system etc. of 2×800MW power generating units

俄罗斯 Russia

1997.5-1999.12

二期2×1000MW机组工程4号机组建筑安装及BOP工程

uivil & erection work and BOP of ultra-supercritical unit 4 of phase project

boiler : 1×3033t/h

turbine generator : 1×1000MW

四川东方

Sichuan

Dongfang

2007.8-2010.4

21

广东国华粤电台山发电厂Guohua Yuedian Taishan Power Plant in Guangdong Province

广东省台山市

Taishan City of Guangdong Province

一期工程输煤系统,4、5号机组建筑及4号机组烟气脱硫等工程

Projects such as PhaseUnit 4 & 5 civil  work, coal handling system, and Unit 4 flue gas desulphurization project etc.

 

2002-2006

二期工程输煤、输灰系统工程

The coal and ash handling system  works of Phase project

 

2008.6.20-

2010.9.1

一期1号、2号、3号、4号机组加装SCR系统土建及设备安装5×600MW subcritical unit of phase I, civil and erection works of unit 1、2、3、4 retrofitting SCR system

 

2011.6-2013.12

22

华润电力登封电厂

China Resources Power Dengfeng Power Plant

河南省登封市

Dengfeng City of Henan Province

boiler : 1×1025t/h

turbine generator : 1×300MW

上海 Shanghai

2003.6.8-

2004.6.24

 

23

华能沁北电厂

Huaneng Qinbei Power Plant

河南省济源市

Jiyuan City of  Henan Province

一期工程

Phase project

boiler : 1×1900t/h

turbine generator : 1×600MW

四川东方

Sichuan Dongfang

哈尔滨 Harbin

2003.5.10-

2004.11.23

二期工程

Phase project

boiler : 1×1900t/h

turbine generator : 1×600MW

四川东方

Sichuan Dongfang

哈尔滨 Harbin

2006.10.1-

2007.12.12

三期2×1000MW超超临界机组BOP建筑安装工程

Phase project 2×1000MW ultra- Supercritical unit BOP civil and erection work

 

2009.7-2011.6

24

国华锦界发电厂

Guohua Jinjie Power Plant

陕西省榆林市

Yulin City of  Shaanxi Province

2、4号空冷机组建筑及安装

civil and erection work of air cooled unit 2 & 4 

boiler :2×2093 t/h

turbine generator  :2×600MW

上海 Shanghai

2004.4.23-

2007.5.1

2006.3.23-

2008.5.16

25

国华黄骅发电厂

Shenhua Guohua Huanghua Power Plant

河北省沧州市

Cangzhou City of  Hebei Province

2号机组建筑安装

Civil & erection work of Unit 2

boiler : 1×2080t/h

turbine generator : 1×600MW

上海 Shanghai

2004.7.1-

2006.12.16

4号机组建筑安装

Civil & erection work of Unit 4

boiler : 1×2080t/h

turbine generator : 1×660MW

上海 Shanghai

哈尔滨 Harbin

2007.6.1-

2009.11.27

26

大唐三门峡发电厂

Datang Sanmenxia Power Plant

河南省三门峡市

Sanmenxia City of Henan Province

扩建工程3号机组及附属安装

extension project erection work of unit 3 and auxiliary equipment

boiler : 1×1900 t/h

turbine generator : 1×600MW

四川东方

Sichuan Dongfang

2004.8.1-

2006.6.28

27

大唐国际潮州三百门电厂

Datang International Chaozhou Sanbaimen Power Plant

广东省潮州市

Chaozhou City of Guangdong Province

2号机组建筑安装工程

Civil & erection work of unit 2

boiler : 1×1900 t/h

turbine generator : 1×600MW

哈尔滨 Harbin

2004.4.1-

2006.7.25

28

前湾燃机发电厂

Qianwan Gas Turbine Power Plant

广东省深圳市

Shenzhen City of Guangdong Province

  boiler : 3×420 t/h

燃机  gas-turbine : 3×270MW

汽轮机 steam turbine : 3×120MW

发电机 generator : 3×390MW

杭州 Hangzhou

三菱公司

Mitsubishi Co.

四川东方

Sichuan Dongfang

2005.5.15-

2007.3.30

29

国电康平发电厂

Guodian Kangping Power Plant

 

辽宁省沈阳市

Shenyang City of Liaoning Province

1号机组建筑安装

Civil & erection work of Unit 1

boiler  :1×1900t/h

turbine generator : 1×600MW

哈尔滨 Harbin

2006.7.30-

2008.12.8

30

国华准格尔发电厂

Guohua Zhungeer  Power Plant

内蒙古准格尔旗

Zhungeer Banner of Inner Mongolia

5、6号机组建筑及6号机组安装

Civil work of Unit 5 & 6, erection work of Unit 6

boiler : 1×1018t/h

turbine generator : 1×330MW

北京 Beijing

2004.4.1

2007.9.30

31

乐山海虹发电有限公司

CFB自备电厂

Leshan Haihong Power Generation Co., Ltd. CFB Captive Power Plant

 

四川省峨眉山市

Emeishan City of Sichuan

Province

超高压循环流化床机组建筑安装

civil & erection work of superhigh pressure circulation  fluidizing bed

boiler : 2×440t/h

turbine generator : 2×135MW

四川东方

Sichuan Dongfang

2004.5

2007.12

32

白山热电厂

Baishan Thermal Power Plant

吉林省白山市

Baishan City of Jilin Province 

2号机组安装及附属建筑安装工程

Unit 2 erection work and auxiliary

civil & erection work

boiler : 1×1025 t/h

turbine generator : 1×300MW

上海 Shanghai

2005.10.16

2007.12.27

33

 

华电白音华金山坑口发电厂

HuadianBaiyinhua Mine Mouth Power Plant

内蒙古锡林浩特市Xinlinhot City of  Inner Mongolia

1号空冷机组建筑安装

civil and erection work of air cooledunit 1

boiler : 1×2080t/h

turbine generator : 1×600MW

北京 Beijing

哈尔滨 Harbin

2006.6.18

2010.8.8

34

天津陈塘庄热电厂

Tianjin Chentangzhuang Thermal Power Plant

天津市

Tianjin City

三期2×300MW机组附属建筑安装及9号机组安装工程

civil and erection work auxiliary of 2×300MW BOP

system of phase;erection work of unit 9

boiler : 1×1025t/h

turbine generator : 1×300MW

四川东方

Sichuan Dongfang

上海 Shanghai

2006.6.22

2008.1.31

35

大唐辽源热电厂

Datang Liaoyuan Thermal Power Plant

吉林省辽源市

Liaoyuan City of Jilin Province

1号机组建筑安装

Civil & erection work of Unit 1

boiler : 1×1065t/h

turbine generator : 1×300MW

武汉

Wuhan

北京 Beijing

2007.9.20

2008.12.28

36

阜新金山煤歼石热电厂 Fuxin Jinshan Coal Gangue Thermal Power Plant

辽宁省阜新市 Fuxin City, Liaoning Province

4× 150MW循环流化床机组 BOP建筑安装工程EPC项目 EPC project civil and erection work of 4×150MW CFB unit BOP

 

2004.9

2008.5

37

调兵山煤矸石发电厂

Diaobingshan Coal

Gangue Power Plant

辽宁省铁岭市

Tieling City of  Liaoning Province

循环流化床空冷机组1号机组

unit 1 circulation fluidizing bed air cooled units   

boiler : 1×1065 t/h

turbine generator : 1×300MW

 

上海 Shanghai

哈尔滨 Harbin

2008.4.15

2009.12.19

38

天津北疆发电厂

Tianjin Beijiang Power Plant

天津市

Tianjin City

2×1000MW超超临界机组公用系统BOP工程

civil & erection work of 2×1000MW  ultra-supercritical

units common system and balance of plant (BOP)

 

2007.8

2009.11

39

神华国华呼伦贝尔发电厂

ShenHua Guohua

Hulunbuir Power Plant

内蒙古呼伦贝尔市

Hulunbuir City of Inner Mongolia

2号空冷机组建筑安装

air cooled unit 2 civil and erection work

boiler : 1×1913t/h

turbine generator : 1×600MW

 

哈尔滨 Harbin

  Shanghai

2008.5

2010.12.1

40

苏州工业园区

华能发电厂

Suzhou Industial Park Huaneng power plant

江苏省苏州市 Suzhou City,

 Jiangsu Province

2×300MW机组3号机组安装及部分附属建筑安装工程

2×300MW unit erection work of unit 3; civil and erection work of partial BOP system

上海

Shanghai

1999.2

2000.4

41

华能淮阴电厂

Huaneng Group Huaiyin power plant

江苏省淮阴市 Hualyin City,

Jiangsu Province

3号机组安装及部分附属系统安装工程 erection work of unit 5 and BOP system

boiler : 1×1018 t/h

turbine generator : 1 × 330MW

哈尔滨Harbin

2003.11

2005.1

42

华能淮阴电厂

Huaneng Group Huaiyin power plan

江苏省淮阴市 Huaiyin City,

Jiangsu Province

5号机组安装及部分附属系统安装工程 erection work ot unit 3 and portion of BOP system

boiler : l×1018t/h

turbine generator : 1× 330MW

哈尔滨Harbin

2005. 7

2006. 8

43

华能太仓发电厂

Huaneng Group Taicang Power Plant

江苏省苏州市 Suzhou City,

 Jiangsu Province

二期工程2×600MW超临界机组3号机组安装及 BOP系统建筑安装工程

2× 600MW ultra.-supercritical coal-fired units erection work of unit 3; civil and erection work of BOP system

boiler : 1 ×1900 t/h

turbine generator : 1 ×600MW

哈尔滨 Harbin

上海东方 Shanghai Dongfang

2003.11

2005.1

44

同力发电厂

Tongli Power Plant

河南省鹤壁市

Hebi City,

Henan Province

2×300MW机组工程4号机组安装工程 unit 4 erection works

boiler : 1× 1025 t/h

 turbine : 2×300MW

四川东方

Sichuan Dongfang

2004.4

2005.9

45

内蒙古上都发电厂

Inner Mongolia Shangdu Power Plant

内蒙古锡林郭勒盟 Huolinguole league, Inner Mongolia

二期扩建工程2× 600MW空冷机组3号机组安装工程

2 × 600MW air-cooled units expansion project of phase II

boiler : 1 ×2070 t/h

turbine generator : 1×600MW

哈尔滨 Harbin

四川东方

Sichuan Dongfang

2005.7

2006.8

三期工程1×660MW空冷机组5号机组及500KV 开关厂安装工程空冷系统建筑安装工程

1 ×660MW coal-fired air-cooled unit phase Ill civil and erection work of unit 5; erection work of 500KV switch yard; civil and erection work of air-cooled system

boiler :1× 2080t/h

turbine generator:1× 600MW

哈尔滨Harbin

2005.11

2007.8

46

通辽发电厂

Tongliao Power Plant

内蒙古通辽市 Tongliao City

 Inner Mongolia

三期扩建2 × 660MW超临界燃煤空冷发电机组5号机组建筑安装工程

2 × 600MW ultra-supercritical coal-fired air-cooledunits phase Ill extension project civil and erection work of units

boiler: 1 ×2070 t/h

turbine generator: 1 × 660MW

四川东方 Sichuan Dongfang

2005.5

2008.7

47

国电庄河发电厂

Guodian Zhuanghe power plant

辽宁省大连市

 Dalian City,

Liaoning Province

2×600MW超临界机组输煤系统建筑安装工程 2×600MW ultra critical unit civil and erection work of coal handling system

 

2005.7

2007.8

48

中电投抚顺发电厂

CRI Fushun Power Plant

辽宁省抚顺市 Fushun City,

Liaoning Province

2×300MW亚临界燃煤供热发电机组1号机组建筑安装工程、及输煤系统建筑安装工程

2 ×300MW subcritical coal-fired heating units civil

and erection work of unit 1 and coal handling systemboiler : 1 × 2080 t/h

 

turbine generator : 1 × 300MW

哈尔滨Harbin

2007.3 2008.12

49

华能巢湖发电厂

Huaneng Group Chaohu Power Plant

安徽省巢湖市 Chaohu City,

Anhui Province

2× 600MW超临界机组l号机组安装工程厂区 BOP安装工程

2×600MW ultra-supercritical coal-fired units erection work of unit 1 and BOP system

boiler :1×1900 t/h

turbine generator :1 × 600MW

哈尔滨Harbin

2007.5

2008.8

50

霍林河发电厂

Huolinhe Power Plant

内蒙古霍林郭勒市 Huolinguole City, InnerMongolia

2×600MW空冷机组2号机组安装工程及500kV

开关厂建筑安装工程

1号、2号空冷系统建筑安装工程

erection work of 2 × 600MW air cooled unit 2;

civil and erection work of 500KV swith yard

boiler :1×2080 t/h

turbine generator: 1 × 600MW

哈尔滨Harbin

2005.11

2008.7

2007.5

2008.8

2×300MW亚临界燃煤供热空冷发电机组6号机组安装及空冷系统建筑安装工程

2×300MW subcritical coal-fired heating air-cooled units

erection work of unit 6; civil and erection work of air- cooled system

boiler: 1 × 2080t/h

turbine generator: 1 × 300MW

哈尔滨Harbin

2007.10

2009.12

51

华能吉林九台发电厂 Huaneng Group Jilin Power Plant

吉林省九台市

Jiutai City,

 Jilin Province

2x660MW超临界燃煤发电机组2号机组安装工程 2× 660MW ultra-supercritical coal-tired units erection work of unit 2

 boiler : 1 ×2100t/h

 turbine generator : 1×660MW

哈尔滨Harbin

2008.2

2009.12

52

华能济宁发电厂

Huaneng Group Jining Power Plant

山东省济宁市

Jining City,

Shandong Province

以大代小热电联产机组改建工程2×350MW亚临界燃煤供热发电机组8号机组及输煤系统安装工程

"Larger Replacing Smaller"         cogeneration units

reconstruction project 2×350MW subcritical coal-tired heating units

civil and erection work of unit 8 and coal handling system

boiler : 1× 440 t/h

turbine generator : 1× 350MW

哈尔滨 Harbin

四川东方

Sichuan Dongfang

2008.5

2009.12

53

华能国际铜川发电厂 Huaneng Tongchuan power plant

陕西省铜川市

Tongchuan City,

Shanxi Province

2×600MW空冷机组BOP安装、灰场安装工程

2 ×600MW air cooling unit

erection work of BOP system and ash yard

四川东方

Sichuan Dongfang

2007.3

2007.12

54

松花江热电厂 Songhuajinag Thermal Power Plant

吉林省吉林市

Jilin City,

Jilin Province

1号机组建筑安装

Civil & erection work of Unit 1

boiler : 1×1165 t/h

turbine generator : 1×350MW

哈尔滨Harbin

2008.9

2011.3

55

华能福州电厂

Huaneng Fuzhou Power Plant

福建省长乐市 Changle City,

Fujian Province

三期工程2 ×660MW超超临界机组5号机组安装工程

2 ×660MW ultra-supercritical coal-fired units Phase III

civil and erection work of unit 5

boiler : 1 ×2042 t/h

turbine generator : 1 × 660MW

 

 

哈尔滨Harbin 上海Shanghai

 

 

2008.72010.7

56

中国水电建设集团

崇信发电厂

Sinohydro Group Chongxin Power plant

甘肃省平凉市

Pingliang City,

Gansu Province

2x660MW超临界燃煤空冷发电机组l号机组安装工程

2× 660MW ultra-supercritical coal-fired air-cooled units civil and erection work of unit 1

boiler:1×2145 t/h

turbine generator:1 ×660MW

哈尔滨Harbin

2007.10

2011.1

57

沈煤集团红阳能源坑口煤研石热电厂

 

Shenyang Coal Trade

Group Hongyang Energy Pithead Coal Gangue Thermal Power Plant

辽宁省辽阳市 Liaoyang City, Liaoning Province

2×330MW亚临界燃煤供热发电机组1号机组建筑安装工程

2 × 330MW subcritical coal-fired heating units civil and erection work of unit 1

boiler:1×1125 t/h

turbine generator : 1×330MW

哈尔滨Harbin 济南Jinan

2008.10

2010.8

58

吉林电力股份有限公司四平热电厂

Jilin electricity Siping Thermal Power Plant

吉林省四平市

 Siping City,

Jilin Province

2×350MW亚临界燃煤供热发电机组1号机组建筑安装工程

2×350MW subcritical coal-fired heating units civil and erection work of unit 1

boiler: 1×1165 t/h

turbine generator : 1× 330MW

哈尔滨Harbin

2008.7

2011.1

59

华能吉林白山煤矸石电厂

Huaneng Group Jilin Baishan Coal Gangue power Plant

吉林省白山市 Baishan City,

Jilin Province

2×330Ml燃煤矸石空冷发电机组2号机组安装工程 2× 330MW coal gangue air-cooled units civil and erection work of unit 2

boiler: l×1180t/h

turbine generator :1×330MW

哈尔滨Harbin

2009.12

2012.8

60

军粮城发电厂

Junliangcheng  Power Plant

天津市

 

Tianjin City

五期9号机组建筑安装工程

Civil & erection work of Unit 9 of Phase project

boiler : 1×1165 t/h

turbine generator:1×350MW

上海 Shanghai

2008.6.30

2010.7.22

61

华电丹东金山热电厂 Huadian Dandong Jinshan Thermal Power

辽宁省丹东市 Dandong City, Liaoning Province

2×300MW供热机组建筑安装工程

civil and erection work of 2× 300MW heating units

boiler: 2×1025 t/h

turbine generator:2× 300MW

济南

Ji nan

北京巴威

Ba Wei in Beijing

北京北汽

Beiqi in Beijing

2009.9

2012.12

62

中国石油抚顺石化公司热电厂

CNPC Fushun Petroleum Chemical Company Thermal Power Plant

辽宁省抚顺市 Fushun City.

 Liaoning Province

扩能改造(2× 100MW)工程 Technical innovation project

(2 ×100MW)

建筑安装

Civil & erection work

 boiler : 3× 460 t/h

 turbine generator: 2 × 100MW

设备供货equipment supply

哈尔滨Harbin 上海Shanghai

2010.6

2012.9

63

国电沈西热电厂

Guodian Shenyang West by-product Power Station

辽宁省沈阳市 Shenyang City, Liaoning Province

2× 330MW供热机组建筑安装工程 civil & erection work of 2×330MW heating units

boiler: 2×1165t/h

turbine generator: 2 × 330MW

哈尔滨Harbin

2010.5

2012.4

64

神华新疆准东五彩湾发电厂

Shenhua Xinjiang Wuxcaiwan Power Plant

新疆 昌吉州

Changji state, Xinjiang

2号机组建筑安装

Civil & erection works of unit 2

boiler: 1× 1200 t/h

turbine generator : 1× 350MW

四川东方 Sichuan Dongfang

2011.4.1

2012.12.19

65

神华神东电力公司店塔电厂

Dianta Power Plant of Shenhua Shendong Power Company

陕西省榆林市

Yulin City,

Shaanxi Province

1号机组建筑安装

Civil & erection work of unit 1

 boiler : 1 × 2025 t/h

 turbine generator : 1× 660MW

上海Shanghai 哈尔滨 arbin

2010.8

2015.12.22

66

华能左权发电厂

Huanneng Zuoquan power plant

山西省晋中地区左权县

Zuoquan county, Shanxi Province

2×660MW超临界机组附属系统安装工程

2× 660MW ultra critical unit Erection work of BOP system

四川东方

Sichuan Dongfang

2010.4

2012.3

67

内蒙古大板发电厂

Inner Mangolia Daban Power plant

内蒙古赤峰市 Chiteng City, Inner Mongolia

2× 600MW空冷机组2号机组建筑及安装工程

2 × 600MW air-cooled units civil and erection work of unit2

boiler: 1× 2080 t/h

turbine generator : 1× 600MW

哈尔滨Rarbin

2007.6

2013.3

68

红沿河核电站

Hongyanhe

Nuclear Power Plant

辽宁省大连市

Dalian City, Liaoning Province

一期(2× 1000MW3号、4号机组常规岛建筑安装工程

civil and erection work of Unit 3&4 conventional island

turbine generator : 2×1000MW

杭州 Hangzhou

三菱公司 Mitsubishi Co.

四川东方

Sichuan Dongfan

2009.3

2016

二期(2×1000MW5号、6号机组常规岛及BOP安装工程2×1000MWUnit 5/6 Conventional Island and BOP erection

Phase II

 

 

2016.1.1

2021.1.31

69

奈曼旗生物质热电联产

工程

Naiman Banner Biomass-Fired Co Generation Power Plant

内蒙古通辽市

Tongliao City,

Inner Mongolia

全厂建筑安装

civil and erection works

turbine generator : 2×12MW

林木质锅炉

wastewood-fired boiler : 2 × 75

杭州Hangzhou

2007.8

2010.6

70

安庆发电厂

Anqing Power Plant

安徽省安庆市 Anqing City,

Anhui Province

二期2×1000MW超临界湿冷燃煤机组输煤系统

及附属生产建筑安装工程

2×1000MW supercritical water-cooling coal-tired units, civil and erection works of coal handling System and BOP system

上海Shanghai

2012.12

2014.11

71

陈塘庄热电厂煤改气搬迁工程

Replacing Coal With Gas Removal ProjeG For Ctrentangzhoang Co-Generation Power Plant

天津市西青区 Xiqing Distric Tianjing City

2900MW级燃气一蒸汽热电联产BOP工程

 two sets of 900MW stage gas-fired and steam co-generation BOP project

上海Shanghai

2012.5

2013.7

72

扬州市生活垃圾焚烧发电厂

Yangzhou Waste Incineration Power Plant

江苏省扬州市

Yangzhou City,

Jiangsu Province

建筑安装civil & erection works

焚烧炉incinerator : 2 ×500t/d

boiler : 2× 43.4t/h

turbine generator: 2 × 12MW

比利时

KEPPEL-SEGHERS Co. in Beigium

四川东方

SichuanDongfang

南京Nanjing

2009.8

2011.5

73

天津贯庄垃圾焚烧综合

处理工程

Guanzhuang waste incinerator project

天津市东丽区

Dongli district

Tianjing City

建筑安装civil and erection works

焚烧炉Incinerator: 2×500 t/d

turbine: 2 × 10MW

比利时

KEPPEL-SEGHERS Co in Belgium

南京Nanjing

2010.12

2013.12

74

大连城市中心区生活

垃圾焚烧处理工程

Dalian Municipal solid waste incineration power generation project

辽宁省大连市

Dalian City, Liaoning Province

建筑安装civil and erection works

焚烧炉Incinerator: 3×500 t/d

turbine : 2 × 15MW

比利时

KEPPEL-SEGHERS Co. in Belgium

南京Nanjing

2010.8

2012.7

75

北京市朝阳生活垃圾综合处理厂焚烧中心

Beijing Chaoyang Household Waste Treatment Plant Burn Centre

北京市朝阳区

Chaoyang district

Beijing City

建筑安装civil and erection works

焚烧炉incinerator : 3 × 600 t/d

turbine : 2 ×20MW

锅炉:四川

Boiler:Sichuan

炉排:;比利时Fire-grate:Belgium

汽机:广州

Tirbine:Guangzhou

 

2014.72016

76

鄂尔多斯市亿鼎煤化工有限责任公司动力中心

及煤运系统施工项目 Power center and coal transport systern construction contract, 0 rdos city billion ding Coal chemical industry Co.,Ltd

鄂尔多斯市

Erdos City

建筑安装civil and erection works

boiler : 3×480 t/h

turbine generator: 2×250MW

四川东方

Sichuan Dongfang

哈尔滨Harbin 济南Ji Nan

2012.6.26

2014.5.01

77

国电天津北塘热电厂 Guodian Beitang Thermal Power Plant, Tianjin city

天津市

Tianjin city

一期(2× 350MW)超临界供热机组工程主体工程输煤系统工程

Phase2× 350MW supercritical heat supply unit project coal handling system work

天津成科

TianJin CHENGKE Mechanical& Electrical Transm- ission Technology Inc., Ltd.

2010.10.15

201 2.10.31

78

华能洛阳热电厂

Huaneng Luoyang Thermal Power Plant

河南省洛阳市 Luoyang City,

Henan Province

1号机组及BOP安装工程

Unit 1&BOP installation work

Boiler : 1×1150 t/h

Turbine generator : 1× 350MW

哈尔滨

四川东方 Harbin Boiler Co. Ltd, Dongfang Boiler Industry Boiler Group Co.Ltd.a

2013. 9.30

2015.5.17

79

鹤壁鹤淇发电厂

Heqi Power Plant in Hebi City

河南省鹤壁市

Hebi City,

Henan Province

1号机组安装工程

Unit 1 construction & installation work

Boiler : 2060 t/h

Turbine generator : 1× 660MW

四川东方 Dongfang Boiler Industry Boiler Group Co.Ltd

2013.12.25

2015. 12.5

80

 

神华神东电力河曲发电厂

Shenhua Shendong Hequ Power Plant

 

山西省忻州市 Xinzhou City,

Shanxi Province

 

2×350MW工程输煤系统和烟囱建筑安装工程

2×350MW coal handling system and chimney civil & installation works

 

 

 

2013.08.23

2015.11.13

81

兴义市煤电铝一体化资源深加工基地清水河工业园热电联产动力车间项目

Coal Power Aluminum Integration Resources (Deep) Processing Base Qingshui River Industrial Area Cogeneration Power Workshop Project, Xingyi City

贵州省兴义市 Xingyi City,

 Guizhou Province

2×350MWBOP安装工程

2×350MW unit & BOP installation work

 

2013.07.20

2015.04.30

82

神华宁煤400万吨/年煤炭间接液化项目动力站装置主厂房区建安工程 Shenhua Ningmei Indirect Liquetaction Coal 4 Million Tons/Year Engineering Project, civil/erection works for Power Station of Main Power Area

宁夏银川市 Yinchuan City Ningxia

8套空冷岛土建、安装

Civil/erection works of 8 sets of air cooling island

Boiler : 6× 640 t/h 4 × 600t/h

Turbine generator:

  2×50MW空冷机组

  4× 60MW空冷机组

   2× 12MW空冷机组

上海锅炉厂 Shanghai Boiler Works Ltd

东方

Dongfang Boiler Industry Boiler Group Co.Ltd.

2013. 11.25-

2014. 12.25

83

神华神皖能源公司安庆电厂二期2×1000MW机组扩建工程

Anqing Power Plant Phase II2×l000MW Unit Extension Work, Shenhua ShenWan energy company

安徽省安庆市 Anqing City

Anhui Province

二期2×1000MW机组扩建工程m标段.输煤系统及附属生产建筑安装施工

Phase2×1000MW unit extension work Tender III coal handling system & BOP civil & erection works

 

2012.12.20

2014.11.28

84

酒泉钢铁(集团)有限责任公司酒嘉风电基地高载能特色铝合金节能技术改造电厂

Jiujia Wind Power Base Wine Features High Load Energy Aluminum Alloy Energy-Saving Technolo-gical Transformation Power Plant, Jiuquan Iron and Steel (Group) Co.,LTD

甘肃省酒泉市 Jiuquan City

 Gansu Province

一期工程1、2号机组BOP建筑、安装工程

 Phase I unit 1/2 BOP civil &  erection works

 

2012. 7.27-

2014. 4.15

85

酒泉钢铁(集团)有限责任公司酒嘉风电基地高载能特色铝合金节能技术改造电厂

Jiujia Wind Power Base Wine Features High Load Energy Aluminum Alloy Energy-Saving Technolo-gical Transtormation Power Plant, Jiuquan Iron and Steel (Group) Co.,Ltd

甘肃省酒泉市 Jiuquan City

 Gansu Province

一期工程3、 4号机组BOP建筑、安装工程

Phase I unit 3、 4 BOP civil & erection works

 

2013. 4.16-

2014.12.31

86

新疆准东五彩湾北二电厂

Xinjiang Huaidong Wucaiwan North No.2 Power Plant

新疆维吾尔族自治区吉木萨尔县

Jimusaer County,Xinjiang Uyghur Autonomous Region

2×660MW超超临界空冷机组3号机组安装工程及部分公用系统安装工程×660MW Ultra-supercritical Air-cooled Unit 3 and partial common system erection

2

 

 

2016.3.15

2017.11.30

87

神华国华广投北海电厂

Shenhua Guohua Guangtou Beihai Power Plant

广西壮族自治区

北海市

Beihai City,  Guangxi Zhuang Autonomous Region

2×1000MW超超临界机组循环水取排水系统及公用系统工程×1000MW Ultra-supercritical circulating water intake and drain system and common system project

2

 

2015.11.28

2018.1.28

88

大唐国际沈抚连接带热电厂

Datang International Shenfu Connection Thermo Power Plant

辽宁省

沈阳市浑南

 

Hunnan District, Shenyang City, Liaoning Province

“上大压小”2×350MW超临界机组新建工程1号机组及公用系统建筑及安装工程upgrade replacement2×350MW supercritical newly built Unit 1 and common system, civil & erection works.

 

 

2016. 4. 1

2017.10.10